Many contractors believing that building "quality" helps them sell more jobs and make more
money.
But how do you define quality? Who sets the standard? To my knowledge, the only quality
standard for construction is the NAHB Residential Construction Performance Guidelines manual.
It is the only manual available to set quality standards in our industry. Even those standards,
however, have lots of room for improvement. Some of the items listed in the manual as minimum
acceptable standards would not be acceptable in our home by either my wife or myself.
There is no real definition of quality in our business because it is nearly impossible to
define the term. If we can't do it, how can our customers possibly be expected to recognize the
difference?
When contractor advertises "top quality", the customer's expectation is far different than
the contractors. The word perfection comes to mind. When the contractor says the job is done,
the customer trots out a laundry list of items they think need to be fixed, torn out or
replaced. This is one of the major reasons homeowners refuse to make final payments to
contractors. No one can agree on the quality standard.
Remember this: If your customer knew the difference between a top quality job and just a
quality job, you would not be necessary. They could and probably would do the job
themselves.
Almost any other contractor can build a given job as well as you can. That is reality. None
of us like to admit there may be other companies that are capable of building a job just as
well or as pretty as we can, but the truth of the matter is, most can. So the issue of top
quality is a mute point.
To prevent problems with customers, your contract needs to be written specifically for work
to be done on the given job. It should be very clear to the customer what is to be done, when,
and to what degree of "quality". Defining quality in your contract will help you define it for
your work, as well.
Then, look at your own standards. You contract to do a major kitchen remodel for $96,379.
You estimate it will take two of your guys, five and a half days each to set the cabinets. When
the time cards come in, you find they have spent eight days on the cabinets.
When you ask your lead guy why the job took longer than the estimated time, he says, "you
wanted a top quality job." That's when you remember you were there while the guys were
installing the cabinets and you had them go back and do two or three things over, each time
emphasizing top quality. One of those items took three hours alone.
Is it necessary, or is it fussing?
Imagine a guy who drives a brand new, candy apple red Corvette. He gives it a quick wash on
Saturday morning, starting at 7:00 am, planning to drive to the local beanery at 9:30 am for
breakfast with a friend. At 10:45 am he is still in the driveway fussing about another smudge
spot on window, a nick in the door, a dirt spot under the front bumper. The smudge/nick/dirt
really exist, but when is enough enough?
If you or your crew spend more time than the job estimate, the money to pay that overage
comes out of your profit. If the profit is not enough to pay for the overage, an overhead
expense will go unpaid while you pay the employees working on your jobs. You know where it goes
from there.
So how do you prevent this problem from happening? First, the owner of the company needs to
define what are acceptable building standards for the company and the type of jobs they build.
An example for remodeling would be that all windows and doors should be set with screws only.
No nails allowed. Those that have been in remodeling a while already know the value of that
standard.
You need a clear time schedule for each individual job and work to be done. When you
estimate a job, you should be able to generate the time allowed for each phase of the job. Then
when you start building, you tell your people, "you have 12 hours for two people to set the
cabinets", "28 hours for three people to frame the new addition", or "45 minutes to set each
door". Put a limit on each phase of the job. When the limit is reached, they stop. No more
fussing, adjusting, tinkering. The individual or crew stops and moves on to the next phase of
the job.
You must be careful here when you first implement this approach to getting your jobs built.
You will get buckets and baskets of BS giving reasons that a job cannot be built in the time
estimated. Assuming your time estimate is accurate and the job can be done in the time
estimated, you need to:
1) Tell them that they can finish that portion of the job on their own time. Their option is
to go home. You will have to find someone else to finish the job.
2) Sub that work out.
3) Adjust your estimates for length of time on various phases of your jobs to get in line
with the speed of your crew.
There are some other options, but if your people won't produce, option 2 is the best
answer.
But be fair. Your guys, regardless of the training you give them or the harrassment that you
bestow on them, can only work so fast. If you doubt that, put your tool belt on for a couple of
days and then come back and we can discuss time issues on your estimate sheet. You must be
realistic in your estimate and also be realistic in what you expect of your employees. Given
fair compensation and a pat on the back for a job well done, most employees will give you their
best effort on any job.
Finally, your time frame for the work to be done should take into account the local area
standards or the local building codes. When your work reaches that level, it is time to quit
fussing and move on.
Build a good job, build what you tell the folks you are going to build and build what is in
the contract. Then stop. If you do not, you lose money.
Copyright © 1999-2009 by Construction Programs and Results. All
Rights Reserved. No part of this website or content thereof may be reproduced, distributed or
transmitted in any form or by any means, nor may any part of this website be stored in a
database or other electronic retrieval system, or any other website, without the prior written
permission of CPR.